penny as in 1 cent coin ... loL
some ppl use hardware nails the rushy one for iron.
1 layer of soils, top it up with nails, and then top it up with 1 more layer of soils, than top layer will be ur gravel.
u should have 3 to 4 inch of soils and 1 inch of gravel, depends on how much u wanna use.